Featured Projects

  • Mike's Carwash main tower with brand
    Mike’s Carwash
    Creating an Appropriate Design template for complex design issues, systems integrations, and waste water reuse requirements.
  • Outside Piles Chevrolet
    Piles Chevrolet Buick
    Piles Chevrolet Buick is a new construction engineering project working within design-build templates established by corporate brand.
  • Trevarren Flats mixed-use renovation Walnut Hills Cincinnati
    Trevarren Flats
    Complex renovation cost management and compliance through diligent application of Chapter 34 requirements.
  • SCPA Alumni Lofts Entrance
    Alumni Lofts
    Renovation of historic Cincinnati property Appropriately Designed and Engineered Early with MEP + Fire Safety.
  • Bear Paddle Swim School exterior in retail development
    Bear Paddle Swim Club
    Entrusted with the brand experience at this indoor swimming facility with saltwater pool at a retail park.
  • GoCo Dunkin Donuts combined retail space
    GoCo Dunkin Donuts
    Appropriate Design succeeds at delivering branded, hybrid gas, c-store, fast food consumer experience.

Engineer Early; protect the aesthetic vision with Appropriate Design.

Engineer Early is the application of value engineering during the design phase of the project. It’s not the value of value engineering, it’s the timing. Engineering early keeps the design and aesthetic value in line with the architect’s vision, and keeps costs in line with the developer’s vision.

You’ll appreciate this difference. It’s your vision. On time. On budget.